統合失調症における運動・動機づけ障害の脳接続異常を解明(New Study Links Cerebellum-Basal Ganglia Connectivity to Anhedonia and Amotivation in Schizophrenia)

ad

2025-06-20 中国科学院(CAS)

中国科学院心理研究所の陳和德博士らの研究チームは、統合失調症患者における快楽消失(無快感)および意欲欠如と、小脳-大脳基底核間の機能的結合の異常が関連していることを明らかにした。fMRIを用いた2つの独立した被験者群(合計患者115名・健常者116名)の解析により、小脳と淡蒼球間の結合の乱れが特に意欲欠如と強く関連することが判明。これまで報酬処理系における皮質・皮質下領域に注目が集まっていたが、本研究は小脳ネットワークの役割を強調するものであり、小脳へのニューロモジュレーションが負の症状改善に有効である可能性を示している。現在、臨床試験が進行中。

<関連情報>

統合失調症における小脳-大脳基底核結合障害:意欲障害への洞察 Cerebellar–Basal Ganglia Dysconnectivity in Schizophrenia: Insights into Motivational Deficits

Xuan Wang , Xiao-dong Guo , Xin-lu Cai , Bing-jie Huang , Yi Wang , Cheng-cheng Pu , Xin Yu , Simon S Y Lui , Raymond C K Chan
Schizophrenia Bulletin  Published:13 June 2025
DOI:https://doi.org/10.1093/schbul/sbaf087

Overview of the Analysis Pipeline. (A) Preprocessing: the preprocessing pipeline was conducted using fMRIPrep and CONN, including slice-timing correction, normalization, quality control, denoising, and smoothing. (B) Network-based analysis: functional connectivity analysis was performed on Sample 1 to identify abnormal subnetworks in the reward network and cerebellum using network-based statistics (NBS). (C) Seed-based analysis: seed-based whole-brain functional connectivity analysis was used to identify altered connectivity in Sample 2, which also served as a validation for the findings from Sample 1. (D) Connectivity-based analysis: correlations between the altered connectivity and symptoms were examined using partial correlation models, controlling for age, gender, and motion parameters. (E) Effective connectivity: spectral Dynamic Causal Modeling (DCM) was then used to reveal causal effects within the identified connectivity in both Sample 1 and Sample 2.

Abstract

Background and Hypothesis

Motivational deficits are core negative symptoms of schizophrenia (SCZ), which have been linked to disruptions in reward network. Recent evidence suggests the cerebellum’s role in motivational and hedonic processing. This study examined its connectivity with the reward network in SCZ and hypothesized that decreased connectivity would be found in SCZ patients and correlated with severe negative symptoms.

Study Design

This study employed a cross-sample validation approach using 2 independent cohorts (Sample 1: NSCZ = 62, NHC = 61; Sample 2: NSCZ = 53, NHC = 55). Resting-state functional connectivity was assessed using network-based analysis to identify disrupted subnetworks, followed by seed-based connectivity analysis to localize specific connections. Effective connectivity was assessed using spectral Dynamic Causal Modeling (DCM) for inferring the directional influences of abnormal connectivity related to amotivation or anhedonia.

Study Results

Network-based analysis in Sample 1 identified a disrupted subnetwork between the cerebellum (lobules VI, VIIb, VIII) and basal ganglia (putamen, caudate, pallidum) in SCZ, with cerebellar–pallidal connectivity associated with amotivation. Seed-based analysis in Sample 2 revealed reduced putamen/caudate-lobule VI connectivity, correlating with amotivation and anhedonia symptoms in SCZ. Spectral DCM indicated reduced excitatory input from cerebellum to the basal ganglia in Sample 1, but such results could not be replicated in Sample 2.

Conclusions

Our findings highlighted the role of cerebellum–basal ganglia connectivity in the pathophysiology of SCZ, particularly in relation to amotivation and anhedonia. This pathway may be a putative target for neuromodulation to ameliorate negative symptoms of SCZ.

医療・健康
ad
ad
Follow
ad
タイトルとURLをコピーしました